By Kai Nakamura · Production roaster & equipment editor · Updated 2026-09-21
Mill City MCR-10 vs Diedrich IR-12
Production throughput under real utility constraints
Mill City 10kg wins on installed cost — confirm Diedrich dealer support in your region before ruling it out.
Also searched: diedrich ir-12 vs mill city 10kg
Decision picker
Specification matrix
| Spec | Mill City MCR-10 | Diedrich IR-12 |
|---|---|---|
| Batch capacity | 10 kg | 12 kg |
| Heat source | 320,000 BTU/h gas | 400,000 BTU/h gas |
| Drum / chamber | Carbon steel drum | Double-wall IR drum |
| Batch time (typical) | 13 min | 14 min |
| Throughput (modelled) | 35.3 kg/h | 40 kg/h |
| Street price band | $42,000 USD | $95,000 USD |
| Exhaust | 750 CFM | 900 CFM |
| Lead time | 10 wks — confirm with dealer | 16 wks — confirm with dealer |
| Automation | Optional Cropster/Artisan RT | IR control panel |
| Service hub | USA | USA |
Batch capacity
Mill City MCR-10
10 kgDiedrich IR-12
12 kgHeat source
Mill City MCR-10
320,000 BTU/h gasDiedrich IR-12
400,000 BTU/h gasDrum / chamber
Mill City MCR-10
Carbon steel drumDiedrich IR-12
Double-wall IR drumBatch time (typical)
Mill City MCR-10
13 minDiedrich IR-12
14 minThroughput (modelled)
Mill City MCR-10
35.3 kg/hDiedrich IR-12
40 kg/hStreet price band
Mill City MCR-10
$42,000 USDDiedrich IR-12
$95,000 USDExhaust
Mill City MCR-10
750 CFMDiedrich IR-12
900 CFMLead time
Mill City MCR-10
10 wks — confirm with dealerDiedrich IR-12
16 wks — confirm with dealerAutomation
Mill City MCR-10
Optional Cropster/Artisan RTDiedrich IR-12
IR control panelService hub
Mill City MCR-10
USADiedrich IR-12
USAManufacturer specs and dealer quotes. Throughput model uses SCA 4-minute cooling allowance. Verify all numbers with OEM before purchase.
Strengths & trade-offs
Mill City Roasters strengths & gaps
- Value pricing
- Fast US delivery
- Manual operation default
Diedrich strengths & gaps
- Infrared precision
- Strong US service network
- Higher gas consumption vs Loring
Deep dives
IR radiant heat transfer
Diedrich IR drums radiate through a double-wall — different first-crack timing than convection.
Operators switching from Probat or Giesen need 15–20 calibration batches, not a copied profile.
What to verify with your dealer
Neither OEM publishes binding street prices — quotes move with queue and freight.